
1 | Decoiler(manual or hydraulic for options) | 1 set |
2 | Feeding device | 1 set |
3 | Main Forming Machine | 1 set |
4 | Hydraulic cutting device | 1 set |
5 | Hydraulic Station | 1 set |
6 | PLC computer control system | 1 set |
7 | 4m Run Out Table | 1 set |
1 | Inner diameter of manual decoiler | 500mm |
2 | Outer diameter of manual decoiler | 1200mm |
3 | Weight capacity of manual decoiler | 5T |
4 | Appearance Size | 6.7*1.6*1.3m |
5 | Raw Material | colored steel or galvanized steel |
6 | Roller material | high grade 45# forged steel,polished,heated,quenched |
7 | Blade Material | CR12 with polished,heated and quenched HRC60-62 |
8 | Chrome Coating | coated with 0.05mm hard chrome |
9 | Control System | PLC control |
10 | Main Motor Power | 4KW |
11 | Hydraulic Power | 3KW |
12 | Roller station | 13rollers |
13 | Material of chain | high grade 45# steel:polished,heated,quenched HRC 45-50 |
14 | Speed of Product | 4-8m/min |
15 | Thickness range | 0.2-0.7mm |
16 | Type of cutting | hydraulic cutting |
17 | Electrical control | PLC frequency control system |
18 | Voltage | 380V 50HZ 3Phases( or as your local requirement) |
19 | Material of rack | complete welded structure of A3 steel plate |
20 | Machine frame stand | welded with 300H-steel |
21 | Type of forming machine | single station with chain transmission |
Our machine | Other company 's machine | Influence of the machine | |
Machine's base | High strength H350 / H400 steel. machine through milling macine after welding | H270 steel mark, after welding use manual polish | keep base in the same horizontal line, ensure product standard |
Roller material | High grade No.45 forged steel, with digital-controlled procession, Plated with 5 um chrome coated | Normal No. 20 steel with Simple polished and have no coating | Roller will have longer use life and ensure the products have same size,no nick on the surface. |
Side wall | Use high strength16mm thickness steel panel mark | Use 12 mm thickness steel panel mark | Ensure machine harder to deform, keep the product accurate and stable |
Active shaft material | High grade solid No.45 carbon steel, Shaft diameter is 72mm. surface CNC polish treatmen | Normal No. 45 steel with no surface treatment | Improve the integrated mechanic feature of the shaft. and ensure the shaft stability keep product standard |
Electrical elements | PLC control panel, transducer imported from Mitsubishi of Japan. Other elements from famous suppliers in China | All the elements are made in china | Machine become more accurate and more stable |
Cutter blade | Cr12 mould steel with quenched treatment | Normal high strength steel without quenched treatment | Stable the integrated mechanic feature of the cutter blade,harder to deform, longer blade's life, ensure product standard |
Jiangyin Dingbo Technology Co., Ltd
Company introduction
We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top quality and competitive price of the products. Company principle: top quality, low price.
We a professional manufacturer of cold forming equipment (especially high difficulty cold formed steel), wins the trust of customers by its honesty, pragmatic operation philosophy, advanced technology, innovative design thinking, excellent quality, superior after sales service, competitive price, etc.
Main products
We mainly produce all kinds of roof/ wall tile roll forming machine, C purlin, Z purlin, C&Z interchangeable purlin roll forming machine, uni channel forming machine, rack shelf roll forming machine, guardrail roll forming machine, cable tray roll forming machine, metal deck roll forming machine, down pipe roll forming machine, rolling shutter door roll forming machine, auto stacker, EPS/PU sandwich panel production line, slitting line, cut to length line, tube mill, etc, mainly in construction use.
After sale service
1). Engineer will give free training lessons to labors in buyer’s factory.
2). The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 for engineer per day.
3). During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4). We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Photo of the Factory
Photos of the Office
Our clients