Home /

Coal Fired Steam Boiler Spare Parts , Oil Fired Boiler Header ASTM In Power

Send your message to this supplier
*From:
Your email address is incorrect!
To:Suzhou orl power engineering co ., ltd
*Subject:
Your subject must be between 10-255 characters!
*Message:
Your message must be between 20-3,000 characters!
Yes!I would like your verified suppliers matching service!
Buy cheap Coal Fired Steam Boiler Spare Parts , Oil Fired Boiler Header ASTM In Power Station from wholesalers
  • Buy cheap Coal Fired Steam Boiler Spare Parts , Oil Fired Boiler Header ASTM In Power Station from wholesalers

Coal Fired Steam Boiler Spare Parts , Oil Fired Boiler Header ASTM In Power Station

Ask Latest Price
Brand Name:ORL Power
Model Number:Customization
Certification:ISO9001/SGS/TUV/ASME/EN
Price:Contact me | Get Latest Price
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability:300Ton/Tons per Month
Delivery Time:50~100 Days
Company Data
Active Member
Contact Person Allen Liu
Business Type: 86-512-56770166
Business Type: Manufacturer Exporter Seller
Officials: Zhangjiagang City, Jiangsu, China
Quality: Quality Certifitation Available
Product Details Company Profile
Product Details

power station boiler coal fired steam boiler oil fired boiler header ASTM

Product Description

Boiler header

Boiler headers, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and
parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

Function

The function of the boiler header is to reduce the thermal deviation, so that the heat absorption, flow, cooling and thermal
efficiency of the working medium can be improved; the size, number and layout of the tubes in the upper, middle and lower parts of the boiler are different, so the header is responsible for connecting the sections to ensure the smooth flow of the working medium.

Application

Boiler header, also called sub-drum,widely used in power generation, petrochemicals, steel, cement, construction and other
industries.
Product Paramenters
Steam Header Body Diameter
6inch ,8inch,10inch,12inch,and so on
Branch Pipe
1',2',3',4',5',6' and so on.
Body Materials
Carbon Steel(20#,20G,SA192,A-1),Alloy Steel(15CrMoG,12Cr1MoVG,T11,T22)etc.
Type
Header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantages
Advanced welding, safe and reliable operation
Working Pressure
1.0mpa,1.25mpa,1.6mpa,2.0mpa,2.5mpa, depend on material
Standard
China GB, ASME
Dimension
Customization
Welding
SMAW, SAW,GTAW (TIG)
Manufacturing Process
Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Drilling→Welding→RT, PT→ Inspection →Heat treatment →Hydraulic pressure test→Painting→Packaging
Remarks
Customized order is also accepted.
Related Products

Boiler drum

Boiler air preheater

Boiler superheater

Boiler economizer

Boiler waterwall panel

Boiler header
Why Choose Us

SUZHOU ORL POWER ENGINEERING CO.,LTD

ORL is a leading compamy of manufacturing industrial boilers, power plant boilers and boiler parts(including steam drum,waterwall panel,heater,economizer,evaporator,superheater,H-finned economizer,spirial fin tube,air preheater,fleu etc.)We supply clients with seamless steel tubes/pipes(ASME,EN or BS).

Service

ORL provides our customer with full range of services including boiler design,fabrication,installation and commissioning ,boiler maintenance, and supervision at site. Our pruduct and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers(600MW or 1000 MW).

Certificates

Verification Certificates of equipments:ISO 9001:2015;ISO4001:2015;ISO45001:2018;CE certificate;CNAS;IAF, etc.
Logistics
For 90% of shipment,we will go by sea,to all main continents such as Middle East,Africa,Oceania and Europe etc.Either by containeror RORO/Bulk shipment.
For neighborhood countries of China ,such as Mongolia,Kazzkhstan,Uzbekistan etc.we can ship by road or railway.
Customers
We are a professional manufacturer of industrial boilers inChina.With the scientific progressive conception of rapid
introduction,we make our machinery cover all over the overseas market.We have been producing our goods with mature techniques and first-class quality.
FAQ
Q1:How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2:How do you control the quality?
1) All ORL machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3:What certifications do you have?
All our products are CE and ISO9001 certified. Numerous design and innovation patent for all our current models and spare parts.

Q4:What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Q5:Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.We offer pickup service at Shanghai for your visit.

Contact Us
  • ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
  • Phone:+86 0512-56770166
  • E-mail: info@orlpower.com
  • Website: http://www.orlpower.com

Company Profile

Suzhou orl power engineering co ., ltd

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

 

 

 

Product Description

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

Packaging & Shipping

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

Company Business

Our products have been wildly used in power plants and large international companies overseas.

 

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.


Contact Information

ADD: Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: orl@orlpower.com 

Website: www.boiler-units.com

 

 

 

Send your message to this supplier
*From:
Your email address is incorrect!
*To:

Suzhou orl power engineering co ., ltd

*Subject:
Your subject must be between 10-255 characters!
*Message:
Your message must be between 20-3,000 characters!
Characters Remaining : (0/3000)

You May Like

China Waste Heat Recovery Heating Boiler Spare Parts , Steam Boiler Parts Header ORL Power wholesale

Waste Heat Recovery Heating Boiler Spare Parts , Steam Boiler Parts Header ORL Power

China Custom Waste Heat Recovery Boiler , Oil Gas Fired Boiler For Industry / Power Station wholesale

Custom Waste Heat Recovery Boiler , Oil Gas Fired Boiler For Industry / Power Station

China Customization Power Plant Boiler , Oil Gas Fired Steam Boiler Low Pressure wholesale

Customization Power Plant Boiler , Oil Gas Fired Steam Boiler Low Pressure

China Power Station Boiler Spare Parts Platen Steam Super Heater TUV Certification wholesale

Power Station Boiler Spare Parts Platen Steam Super Heater TUV Certification

China CFB Coal Fired Boiler Economizer In Thermal Power Plant ISO9001 Passed wholesale

CFB Coal Fired Boiler Economizer In Thermal Power Plant ISO9001 Passed

China Gas Water / Gas Fire Steam Boiler Spare Parts Superheater In Thermal Power Plant wholesale

Gas Water / Gas Fire Steam Boiler Spare Parts Superheater In Thermal Power Plant

China Power Station Waste Heat Recovery Boiler Spare Parts Economizer Spiral Finned Tube wholesale

Power Station Waste Heat Recovery Boiler Spare Parts Economizer Spiral Finned Tube

China ASME SA210 Low Carbon Steel Boiler Tubes / Seamless Boilerpipe Cold Drawn wholesale

ASME SA210 Low Carbon Steel Boiler Tubes / Seamless Boilerpipe Cold Drawn

China Heat Exchanger Stainless Steel Coil Tube For Shell Steam Superheater / Boiler / Condenser wholesale

Heat Exchanger Stainless Steel Coil Tube For Shell Steam Superheater / Boiler / Condenser

China Carbon Steel Boiler Spare Parts Economizer H Fin Tube , Double H / HH Fin Pipe wholesale

Carbon Steel Boiler Spare Parts Economizer H Fin Tube , Double H / HH Fin Pipe

China ASME SA210 Low Carbon Steel Boiler Tubes / Seamless Boilerpipe Cold Drawn wholesale

ASME SA210 Low Carbon Steel Boiler Tubes / Seamless Boilerpipe Cold Drawn

Inquiry Cart 0