
ComFlor 210 has very effective cross stiffener technology and the deep profile shape provides a very efficient metal deck and composite slab, with a low usage of concrete. Slimflor systems have wider lower flange steel beams that allow the deck to land on the bottom flange.
Efficient - low use of steel and concrete.
Versatile – top or bottom flange application.
Nestable profile gives low transport and handling costs.
Specifications:
Name | steel decking formwork |
Base material | Hot Dipped Galvanized Steel Sheet |
Steel Grade | SGCC |
Yield strength | Q235 or Q345 Refer to Standards GB/T1591-2008 |
Thicknes | 0.8 -1.5mm(normal 0.8,1.0,1.2) |
Zinc coating | 60-275g/m2 |
Wave Height | 51mm-76mm |
EffectiveWidth | 688mm-940mm |
Length | 0-11.8m |
Less than 5.8m load in 20GP | |
5.8m-11.8m load in 40GP | |
Packing | Bundle ,water-proof package with steel belt |
Delivery time | 20 days after confirmation |
Following are some of typical profiles available in market:
| YXB51-200-600 |
YXB65-186-558 | |
YXB60-253-760 | |
YXB60-180-540 | |
YXB51-200-600 | |
YXB65-186-558 | |
(2) Opened type galvanized steel floor decking | YX75-230-690 |
YX75-200-600 | |
YX38-152-915 | |
YX51-305-915 | |
YX76-305-915 | |
YX75-230-690 | |
YX75-200-600 | |
YX51-250-750 | |
YX51-335-1005 | |
YX76-344-688 | |
(3) swallow tail galvanized steel floor decking | YX51-200-600 |
YX51-190-760 | |
YX51-200-800 | |
YX51-200-600 |
Advantages:
Greater Durability
The FAMOUS steel base product has a Z350 zinc-coating mass. It was
selected to provide superior corrosion protection in service,
directly as a result of increased coating mass. FAMOUS steel is
also available with a Z450 coating mass with a 15 year warranty.
Comprehensive shear stud welding tests across a range of base
thickness with both coating masses were undertaken to ensure
consistent results can be achieved on site.
Unbeatable Strength
Steel and concrete composite slabs are lighter and stronger than
most conventional slabs. The steel decking provides tensile
reinforcement, combining with the compressive strength of the
concrete for an all round stronger slab. Steel decking profiles are
designed to prevent any longitudinal slip between the steel and
concrete in the slab itself, and any transverse movement between
the slab and supporting beams.
Greater Savings
The weight savings achieved in composite slabs can be passed on to
other areas of the design, such as foundations. And because steel
decking acts as permanent formwork, it can significantly reduce the
need for propping or temporary formwork -saving both time and
money.
Easy On-Site Handling
Steel decking is delivered to site in pre-cut lengths, and in
pre-packaged bundles. The bundles can be easily craned into work
areas, and the individual sheets quickly layed by hand. One truck
can carry 1,000 sq metres of decking at a time, and a team can
install up to 400 sq metres in a day.
Speedy, Safe Construction
A composite slab effectively acts as a safe working platform. Once
the slab is poured, following trades can get on with their jobs
below almost immediately. At the same time, work can continue
unhindered on the floors above, allowing simple installation of
services. Cable trays, ductwork and service pipes can be suspended
neatly underneath the slab with purpose designed clips, brackets
and hangers that locate easily and quickly into recesses in the
steel decking profile.
To complete our floor decking products we advise a complete floor slab construction by adding the supply and laying of reinforced concrete. This single point solution allows a fully integrated metal deck and concrete slab with associated trade interface and program advantages.
Composite slab which is comprised of lightly reinforced concrete cast on profiled steel decking are an option whether the beams are downstand or integrated within the slab depth for a shallow floor form of construction. The slabs are normally reinforced using an upper layer of mesh and, sometimes additional bars in the troughs (usually for longer periods of fire resistance and heavy loads). Fiber reinforcement may also be used. Spans of up to 4.5 m can be achieved using trapezoidal decking. Some so-called deep decking profiles also exist (over 200 mm deep), that can span 6 m or so without propping during construction.
While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.
The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.
So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.
Following are some typical detail:
Warmly welcome various clients from International market to enquiry and visit us!
FAMOUS Steel Engineering Company
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are several typical companies namely:
1. Hangzhou FAMOUS Steel Engineering Company
2. FASEC (Hangzhou) Window Wall Company
3. Hangzhou FASEC Building Material Company
Hangzhou USEU Metal Manufacturing Company and some more not listed here.
The key business scope of FASECbuildings Group include but not limited at:
1. Structural Steelworks & Steel Framing (Heavy/Light) construction
2. Glass Windows Doors, Curtain Wall Facade, Aluminum Panels Cladding, Partition Walls, Railing & Louvers, Screens Grills, BIPV etc
3. Building Roof Wall Flooring integrated material and other interiors new material R & D.
FASECbuildings Group always aim to offer cost saving prefab materials for USA-Europe & UK-Australia etc foreign standard market customers, with freely technical supports like engineering design when needed/detailing drawings/site construction guidance etc. We have multiple certification/experiences as well as the overall 2D/3D modelling capability for the building framing and the surroundings.
Brief Introduction of Subsidiaries:
1. Hangzhou FAMOUS Steel Engineering Co.,ltd. focus on the Design & Construction of various Steel Buildings and Structural Steelworks fabrication. The company have received a lot of foreign projects ranging from warehouse buildings, multi-storey apartments, high rise office & hotel buildings, space framing theaters, triangle truss buildings, to steel bridges, handling machinery framing, power plant towers, mining production line steelworks, cement production line steelworks, petro-chemical rackings etc. Basically the company have the full capability to operate various large-scaled projects complex except the simple building project.
2. FASEC (Hangzhou) Window Wall Company specializes in the offer of various aluminum & glass-related products design/manufacture/supply & installation. We have successfully supplied quite a lot of insulated & laminated glass panes, windows, glass doors, curtain walls, partition walls, railings, louvers, grills, metal claddings etc not only in China but also around the world. Australian standard, British Standard, Europe standard, and American standard etc aluminum & glass facade products are in our main research & development range.
3. Hangzhou FASEC Building Material Company play the role of the bridging and lubricating with different customers of new building material requirement for roof wall floor and interiors. Our building material team always are on the way to research and develop new style building material to save cost and time of building industrial customers. USEU Metal factory is its strong manufacturing backup force, and our own engineering team can offer various technical supports too.
FASECBuildings Group have passed by series of certifications like the quality management system (ISO 9001:2008), the Europe product quality control system EN1090, the structural fabrication system certificates of Europe ISO3834 and America AWS D1.1, the Australia AS2047 Glazed Windows Doors Qualifications etc.
Currently, FASECbuildings Group have spread its network across Xi’an, Shanghai, Nanjing, Guangzhou, Wuhan, Xiangfan, Liuzhou, Wuhu, Suzhou, Zhengzhou, and Yunnan, etc., as well as exporting business with America, Canada, Australia, New Zealand, United Kingdom, Germany, France, Bolivia, Chile, Argentina, Uruguary, Peru, Thailand, Philippine, Nigeria, Vietnam, South Africa, Ghana, Kenya, Zambia, UAE, Sudan, Iran, Irap, Angola, Poland, Mongolia, Russia and so on.
Through so many domestic & overseas project cases, FASECbuildings Group has successfully won reputations and experiences not only in China, but also in various foreign standards markets with examples of Europe Standards, America Standards, Australia Standards, British Standards, etc building related materials and building construction.
We keep improvement and innovation, with the slogan of “USA-EUROPE Standard Engineering and Quality Control Build Our Brand Reliability! One Trial Order Bring Constant Cooperation!”
Warmly welcome Customers to visit and communicate with us for free budget and detailed products catalog obtaining. Thank you all.